Project Location        
Ankara / Turkey
Year of Construction
2020-2016
Project Work Group
Super Structure
Project Category
Building Complex

Employer

Kırıkkale Municipalty Directrote Of Plan and Project

Actual Status

Completed
Job Identifler
Project Location        Kırıkkale / Turkey
Project Work Group Superıor Structure
Project Category Housing Complex
ProJect Scope Of Bid Turnkey Lumpsum
   Employer of the project for which the contract was signed on 11.07.2016 is Kırıkkale Municipality. Within the scope of the protocol made between MKE and Kırıkkale Municipality, a building complex with 564 houses and 1 social facility was constructed with climbing formwork system according to the requirements of the projects of MKE fields. Project consisting of 14 blocks with 11-floors and 1 social facility with 4-floors includes basic structure, architectural and finishing works, electrical and mechanical works, infrastructure and environmental management, car parks and roads, structural and vegetal landscape works.

Project Information
Date Of Contract 11.07.2016
Date Of Completion 23.06.2020
Completion Time 1443 Day
Total Length Of Line 106.00 m2
 Within the scope of the project, which was carried out with the aim of providing modern urbanization with a high quality of life in the lodgings belonging to the Machinery and Chemistry Industry (M.K.E.), 564 flats of 150 m2 each were built on a land of 40,000 m2, and 300 open car parks planned for two cars per flat were built. In the site where 2 tennis and basketball courts are built, there are also 2 Security Buildings that control the entrances and exits.