Job Identifler |
|
Project Location |
Kırıkkale / Turkey |
Project Work Group |
Superıor Structure |
Project Category |
Housing Complex |
ProJect Scope Of Bid |
Turnkey Lumpsum |
Employer of the project for which the contract was signed on 11.07.2016 is Kırıkkale Municipality. Within the scope of the protocol made between MKE and Kırıkkale Municipality, a building complex with 564 houses and 1 social facility was constructed with climbing formwork system according to the requirements of the projects of MKE fields. Project consisting of 14 blocks with 11-floors and 1 social facility with 4-floors includes basic structure, architectural and finishing works, electrical and mechanical works, infrastructure and environmental management, car parks and roads, structural and vegetal landscape works.
Project Information |
|
Date Of Contract |
11.07.2016 |
Date Of Completion |
23.06.2020 |
Completion Time |
1443 Day |
Total Length Of Line |
106.00 m2 |
Within the scope of the project, which was carried out with the aim of providing modern urbanization with a high quality of life in the lodgings belonging to the Machinery and Chemistry Industry (M.K.E.), 564 flats of 150 m2 each were built on a land of 40,000 m2, and 300 open car parks planned for two cars per flat were built. In the site where 2 tennis and basketball courts are built, there are also 2 Security Buildings that control the entrances and exits.