Job Identifler |
|
Project Location |
Karaman / Turkey |
Project Work Group |
Superior Structure |
Project Category |
Sports Complex |
ProJect Scope Of Bid |
Turnkey Lumpsum |
Employer of the project for which the contract was signed on 19.07.2017 is the YOUTH and SPORTS MINISTRY. The project having tribune with the capacity of 15.000 audiences, protocol tribune, lodge and closed parking areas to be constructed as semi-closed includes basic structure, architectural and finishing works, electrical and mechanical works, infrastructure and environmental management, car parks and roads, structural and vegetal landscape works
Project Information |
|
Date Of Contract |
18.07.2018 |
Date Of Completion |
On Going |
Completion Time |
On Going |
Total Length Of Line |
69.000 m2 |
New city stadium for 15 thousand people are integrated with Red - White Colors which is consist of Karaman Spor's official team colors . In the stadium, which is designed according to the harsh climate of Karaman province, the Tribune Radiant Heating System is put into operation so that the spectators can watch the match in winter, and there is also Underfloor Heated Natural Grass Floor for the footballers to play matches in snowy weather. The stadium, which was built according to the European Football Federations Union (U.E.F.A.) standards, has a protocol tribune for 241 people, 25 lodge halls, 2 different protocol hospitality halls, a press tribune for 155 people, a meeting room for 100 people, a cafeteria, and a parking lot for 500 cars, both indoor and outdoor.