Job Identifier |
|
Project Location |
Balıkesir / Turkey |
Project Work Group |
Super Structure |
Project Category |
Healt Complex |
Project Scope Of Bid |
Turnkey Lumpsum |
The employer of the project, whose contract was signed on 01/04/2023, is the GENERAL DIRECTORATE OF THE MINISTRY OF HEALTH. The project, which consists of 2 blocks of Hospital Building, 1 block of indoor parking, 1 emergency building and a closed area of 96 thousand square meters; It will serve with a capacity of 400 beds in an area of 35 thousand 429 square meters and is planned as 2 floors with basement, ground plus 8 floors.
Project Information |
|
Date Of Contract |
04/01/2023 |
Date Of Completion |
On Going |
Completion Time |
On Going |
Construction Area |
96.000 M2 |
Due to the fact that the region is located in the 1st degree earthquake zone, the hospital building, which was built with 192 seismic isolators, has a parking lot for 800 vehicles. The planned 400-bed project includes 108 double beds and 84 single beds. In the hospital building, there are 82 polyclinics, 13 operating rooms, 88 intensive care beds, 20 box physical therapy units, 10-bed dialysis unit, 5 beds and 6-box chemotherapy units, SDL and 28-bed palliative intensive care units.