The employer of the project, the construction of which was started on 01.08.2001 and completed on 20.10.2001, is the General Directorate of Jockey Club of Turkey. The project includes Izmir Hippodrome and the Waste Water Networks of the Barns, Inspection Manholes and ground corrections.

Project Information
Date Of Contract 2001
Date Of Completion 2001
Completion Time N/A
Total Length Of Line N/A
In the project, which was completed in a very short time of 60 days, the total length of the wastewater network line laid is 6 km, and ground improvement was made in an area of ​​58.000 m2.