Project Location        
Orhaneli / Bursa
Year of Construction
2011-1999

Client:

State Hydraulic Works (DSİ)

Current Status:

Completed
Job Identifier
Location   Bursa / Türkiye
Group                     Infrastructure Projects
Sub Category       Dams & Ponds
Proposal Type      Unit Price

The project, commissioned by the State Hydraulic Works (DSİ), commenced on 11.02.1999 and was successfully completed on 03.01.2011. The project scope included the construction of the spillway and dam body. Located within the borders of Karıncalı town in Orhaneli district, the pond was built on Bozönü Stream, which flows into the Orhaneli River, for irrigation purposes.


Project Information
Contract Date       11.02.1999
Completion Date 03.01.2011
Length   Not available
Capacity  865.000 M3
Construction of the pond embankment began in 1999, utilizing a zoned earth-fill dam type with a total fill volume of 0.355 hectometer cubic and a foundation height of 31 meters. The reservoir has a water storage capacity of 0.685 hectometer cubic and is planned to irrigate approximately 308 hectares of agricultural land.