Project Location        
Çanakkale / Biga
Year of Construction
2010-2009

Client

Biga Municipality

Current Status

Completed
Job Identifler
Location Çanakkale / Türkiye
Group                     Infrastructure Projects
Sub Category       Waste & Drinking Water
Proposal Type      Unit Price
The project, commissioned by the Biga Municipality, commenced on 05.09.2008 and was completed on 30.06.2010. The scope of the project includes the construction of a sewer collector line, inspection manholes, and a pumping station.

Project Information
Contract Date       05.09.2008
Completion Date 30.06.2010
Length                     48.000 M
Capacity      Not Avaliable
Designed to integrate and enhance Biga’s sewer infrastructure, the project utilized corrugated pipes with diameters ranging from 20 cm to 100 cm.