Project Location:        
Cayırlı / Erzincan
Year of Construction:
2012-2011

Client:

BOTAŞ - Tecnicas Reunidas

Current Status:

Completed
PROJECT PROFILE
Location Erzincan / Türkiye
Group                     Industrial Facilities
Sub Category        Oil and Gas Facilities
Proposal Type      Lumpsum Turnkey
The Harmantepe Natural Gas Compressor Station project, which commenced on December 1, 2011, was completed on February 28, 2014. The project scope included 4 natural gas compressor stations, 2 six-story staff residences, 2 main security buildings, a guesthouse, cafeteria, control and maintenance building, gas skid building, generator building, heating plant, enclosed garage and vehicle passage roads.

PROJECT INFORMATION
Contract Date       01.12.2011
Completion Date 28.02.2014
Enclosed Area       Not available
Capacity  2.000.000 m3/H
As a crucial component of the NABUCCO Project, which transports natural gas from the Caspian and Middle East to Europe, this station plays a key role in enhancing the efficiency and security of the existing natural gas network. By regulating the gas flow and increasing transmission capacity, the facility ensures a more stable and reliable gas supply. The station, with a gas compression capacity of 2 million m³ per hour, has been built over a 52,000 m² site.