Project Location:        
Badırma / Balıkesir
Year of Construction:
2022 - On Going

Client:

General Directorate of Eti Maden Enterprises

Current Status:

Ongoing
PROJECT PROFILE
Location                 Balıkesir / Türkiye
Group   Industrial Facilities
Sub Category        Production Plants
Proposal Type      Lumpsum Turnkey

The contract for the project was signed on January 17, 2022, with Eti Maden General Directorate as the client. The facility is designed to have an annual production capacity of 500 tons, featuring a drying furnace and Submerged Arc Furnace (SAF) capable of producing 2,500 kg of finished goods per day. The facility consists of seven main production units: Raw Material Storage Unit, Raw Material Preparation Unit, Raw Material Weighing & Feeding Unit,Smelting Unit, Casting & Cooling Unit, Crushing & Screening Unit, Packaging Unit.


PROJECT INFORMATION
Contract Date       17.01.2022
Completion Date 17.04.2025
Enclosed Area       Not available
Capacity    500 tons / Year
As Turkey’s first Ferroboron Production Facility, the project will enable the production of ferroboron, a material having extensive and specialized use cases in aerospace, automotive, and defense industries. Developed through technology transfer from China, this facility is positioned as a strategic milestone for enhancing Turkey's market share in the global boron industry, given that Turkey holds the world’s largest boron reserves.