Project Location:        
Biga / Çanakkale
Year of Construction:
2014-2012

Client:

İller Bankası

Current Status:

Completed
PROJECT PROFILE
Location                 Çanakkale / Türkiye
Group                     Industrial Facilities
Sub Category        Treatment Plants
Proposal Type      Lumpsum Turnkey
The Biga Wastewater Treatment Plant, commissioned by Biga Municipality and supervised by İller Bankası, was successfully completed within the designated timeframe. The project scope included aerated grit chamber, pumping stations, distribution structure, anaerobic basin, aeration basins, clarification basins, administrative buildings.

PROJECT INFORMATION
Contract Date       07.12.2012
Completion Date 22.08.2014
Enclosed Area       Not available
Capacity 13.972 m3 / Day
Spanning an area of 45,000 m², the facility is designed to serve a population of 150,000 and has a daily wastewater treatment capacity of 13,972 m³. The construction covered structural works, architectural and finishing works, mechanical and electrical systems, as well as infrastructure and landscaping.