Project Location:        
Balıkesir
Year of Construction:
2021-2020

Client:

Balıkesir Metropolitan Municipality

Current Status: 

Completed
PROJECT PROFILE
Location                 Balıkesir / Türkiye
Group                     Industrial Facilities
Sub Category        Oil and Gas Facilities
Proposal Type      Lumpsum Turnkey
The contract for the project was signed on April 21, 2021, with Balıkesir Metropolitan Municipality as the employer. The project includes 2 CNG gas compressors, 2 compressor cabins, 2 dispensers (double-filling nozzles), 2 storage tanks, an automation system, high and medium-pressure pipelines, a canopy, a fire suppression system, a transformer, and a generator. Located near Balıkesir Bus Terminal, the project also features a Public Transport Repair and Maintenance Workshop in addition to the fueling station.

PROJECT INFORMATION
Contract Date       21.04.2021
Completion Date 31.12.2021
Enclosed Area       Not available
Capacity  16 Bar 150 s m3/H
Designed to serve 65 public transport buses operating on CNG fuel, the facility is part of an initiative to enhance energy efficiency and reduce emissions through clean compressed natural gas (CNG). Thanks to this environmentally friendly system, annual carbon monoxide emissions will be reduced by 2,660,668 grams, contributing to improved air quality.