Project Location        
Konya / Türkiye
Year of Construction
2011- 1994
Project Work Group
Transportation
Project Category
Viaducts

Employer:

Highways Konya 3 Rd Regional Directorate

Actual Status:

Completed
Job Identifier
Project Location Konya / Turkey
Project Work Group Transportation
Project Category Viaducts
Project Scope Of Bid Offer Unit Price
Employer of the project whose contract was signed on 10.10.2016 is the 3rd Reigonal Directrote of Highways in Konya. The bridge has a length of 300 meters and includes 6 vertical columns. The bridge, which is 28 meters heigh from the ground has 2 lanes for each direction.

Project Information
Date Of Contract 10/10/2016
Date Of Completion 09/25/2018
Completion Time 715 Day
Total Bridge Length 300 MT
The viaduct, which forms the transition route of Konya Altınapa Dam, provides a total road width of 14 meters from 7 meters of belt length on a round-trip double road.