Job Identifier |
|
Project Location |
Orhaneli / Turkey |
Project Work Group |
Water Structures |
Project Category |
Dams And Pods |
Project Scope Of Bid |
Offer Unit Price |
The employer of the project, the construction of which was started on 11.02.1999 and completed on 03.01.2011, is the State Hydraulic Works. It covers spillway and body construction works.
Project Information |
|
Date Of Contract |
02/11/1999 |
Date Of Completion |
01/03/2011 |
Completion Time |
11 Years |
Pond Capacity |
865.000 M3 |
It was built for irrigation purposes on the Bozönü Stream, which flows into the Orhaneli Stream, within the borders of the Karncalı town of the Orhaneli District. The pond dam, the construction of which was started in 1999, is of the zoned earth fill type and the fill volume is 0.355 hectometers, and its height from the foundation is 31 meters. The pond, which has a water capacity of 0.865 cubic meters, is expected to irrigate 308 hectares of agricultural land.