Loading...
06.04
2015

Hatay – Dörtyol Waste Water Treatment Plant Construction has been completed by the finance of İller Bankası


Hatay – Dörtyol Waste Water Treatment Plant construction has been completed by the date of 06.04.2015 and facility has been opened for service. The project which will be operated by our company for 1 year, consists of ventilated sand holder, elevation centers, distribution structure, main aerobic pool, ventilation pools, sedimentation pools and administrative buildings. Treatment capacity of the facility is 23.000 m3/day.